Engineering resources

Engineering guides and RFQ preparation

Use practical comparisons, sizing examples and drawing handoff guidance to prepare a clearer motor or generator inquiry.

Engineering editorial · Reviewed 2026-10-21

Conceptual engineering diagram for engineering guides and rfq preparation
Concept schematic · Not to scale · No product rating implied

The engineering decision

Define the boundary before the build.

Start with the non-negotiable constraints and identify what remains open to engineering recommendation. The pages below explain the information needed for review, the trade-offs to resolve and the evidence to agree before a prototype is released.

Options and review points
OptionWhen it fitsResolve before release
Axial flux vs radial flux: packaging decisionsCompare flux direction, installation envelope and thermal interfaces before choosing a topology. A short motor package is only one part of the decision.Review inputs and acceptance criteria on the detailed program page.
Pancake and disc motor selection guidePancake, disc, disk, flat and printed-armature are overlapping search terms. Identify the architecture before comparing drawings or requesting a quotation.Review inputs and acceptance criteria on the detailed program page.
Low RPM generator sizing: torque and voltageConvert the output target into a shaft torque requirement, then check voltage and loaded output. Low speed alone does not describe a generator specification.Review inputs and acceptance criteria on the detailed program page.
Drawing upload and NDA review processShare a non-confidential envelope first, or request an NDA before releasing confidential geometry. Files go to the engineering inquiry mailbox as attachments.Review inputs and acceptance criteria on the detailed program page.

From a program direction to a reviewable brief

Use the specific page to collect the required dimensions, operating points and interfaces. Share sample quantity, annual volume and target schedule so the team can distinguish prototype engineering from repeat production. A 3–5 week prototype schedule is a planning target for suitable programs after DFM, material availability, drawing freeze and order confirmation; your quotation confirms the actual lead time.

Prepare your RFQ

The inputs that make a useful review.

Information to include with the inquiry
InputWhat to sendWhy it matters
Operating requirementTorque or output power at speed, including peak durationEstablishes the actual duty.
Integration boundaryEnvelope, voltage, controller and cooling conditionsPrevents interface assumptions.
Delivery scopeKit, complete assembly or released build-to-print componentAssigns design and inspection responsibility.

For confidential geometry, complete the NDA review before disclosure.

Continue your review

Related engineering programs

From constraint to a controlled brief

Bring the dimensions.
Define the evidence.

Request an engineering review ↗

Prototype planning target: 3–5 weeks for suitable programs after DFM, material availability and drawing freeze. Quotation confirms feasibility, cost and schedule.