Skip to content

Base platforms

Starting platforms for custom motor programs

A program direction can reduce early uncertainty. Select low-voltage drives, coreless generators or frameless robotic kits, then confirm the actual scope.

Engineering editorial · Reviewed 2026-10-21

Conceptual engineering diagram for starting platforms for custom motor programs
Concept schematic · Not to scale · No product rating implied

The engineering decision

Define the boundary before the build.

Start with the non-negotiable constraints and identify what remains open to engineering recommendation. The pages below explain the information needed for review, the trade-offs to resolve and the evidence to agree before a prototype is released.

Options and review points
OptionWhen it fitsResolve before release
Low-voltage axial drive programs for 48–96 V systemsUse 48 V / 10–30 kW as an engineering brief, then check current, speed, cooling and installation constraints. 72 V and 96 V programs can be reviewed in the same system-level process.Review inputs and acceptance criteria on the detailed program page.
Coreless axial generators for low-speed energy systemsDefine the speed range, mechanical torque and electrical load before choosing a disc-generator configuration. Wind, micro-hydro and range-extender programs have different operating and starting conditions.Review inputs and acceptance criteria on the detailed program page.
Frameless disc motor kits for robotic integrationDesign the motor kit around the joint’s bore, axial envelope and continuous operating duty. Agree the bearing, encoder, cooling and assembly boundary before a rotor/stator kit is released.Review inputs and acceptance criteria on the detailed program page.

From a program direction to a reviewable brief

Use the specific page to collect the required dimensions, operating points and interfaces. Share sample quantity, annual volume and target schedule so the team can distinguish prototype engineering from repeat production. A 3–5 week prototype schedule is a planning target for suitable programs after DFM, material availability, drawing freeze and order confirmation; your quotation confirms the actual lead time.

Prepare your RFQ

The inputs that make a useful review.

Information to include with the inquiry
InputWhat to sendWhy it matters
Operating requirementTorque or output power at speed, including peak durationEstablishes the actual duty.
Integration boundaryEnvelope, voltage, controller and cooling conditionsPrevents interface assumptions.
Delivery scopeKit, complete assembly or released build-to-print componentAssigns design and inspection responsibility.

For confidential geometry, complete the NDA review before disclosure.

Continue your review

Related engineering programs

From constraint to a controlled brief

Bring the dimensions.
Define the evidence.

Request an engineering review ↗

Prototype planning target: 3–5 weeks for suitable programs after DFM, material availability and drawing freeze. Quotation confirms feasibility, cost and schedule.