CUSTOMAXIALFLUX — CORELESS COIL POSITIONING FIXTURE REVIEW CHECKLIST https://customaxialflux.com/resources/axial-flux-coreless-coil-positioning-fixture Planning request only. No hardware testing, tooling fabrication or potting release is implied. 1. GENERAL PROJECT IDENTIFICATION Company / organization / country: Project name / drawing revision / NDA status: Prototype target quantity / serial production schedule: 2. STATOR & WINDING ENVELOPE Stator topology (AFIR, YOKED, TORUS, double-rotor single-stator): Stator active dimensions: Outer Diameter (OD, mm) / Inner Diameter (ID, mm): Coil count (N) and nominal pitch angle (360/N deg): Conductor type (round magnet wire, flat copper strip, litz wire bundle): Turns per coil / parallel branches per phase / phase connection (star/delta): Nominal uncompressed coil thickness (mm) vs design pitch height (Z, mm): Allowable out-of-plane runout / flatness tolerance (TIR, mm): 3. FIXTURE DATUMS & GD&T SCHEME Primary Datum A (axial mounting bed): Flatness requirement / surface finish: Secondary Datum B (pilot ID or shaft center): True position tolerance: Tertiary Datum C (timing keyway or Phase U Slot 1 dowel pin): Radial dividing comb tooth width and allowable pitch tolerance (+/- deg or +/- mm): Clamping method (top bridge plate, toggle clamp, vacuum hold-down, precision shim): 4. LEAD EXIT & ROUTING SPECIFICATIONS Lead wire cross-section and exiting take-off angles: Lead comb channel depth / approved conductor minimum bend radius: Silicone grommet / elastomeric seal plug requirements to prevent resin flash: Phase terminal connection type (flying leads, brazed ring lugs, terminal PCB): 5. PROCESS & THERMAL CONDITIONS Potting pre-heat temperature (deg C) and duration: Fixture tooling material (Aluminum 6061-T6 hard anodized, P20 steel, PEEK, 316L SS): Thermal expansion differential allowance (alpha_fixture vs alpha_copper): Mold release type and allowable film thickness on datum surfaces: 6. PRE-POTTING QUALITY GATES CMM / optical coordinate verification plan for coil pitch and height: Approved electrical procedure revision, test-record reference, electrodes, voltage, duration and acceptance criteria: Traveler inspection sign-off criteria before mold closure: Request an NDA before confidential CAD disclosure; a request does not execute an agreement. Send through https://customaxialflux.com/contact or inquiry@customaxialflux.com